linkedin icon
Na sprzedaż
Dom
Nowe konstrukcje
Dom w , Šibenik-Knin County 12775883
Dom w , Šibenik-Knin County 12775883
Dom w , Šibenik-Knin County 12775883
Dom w , Šibenik-Knin County 12775883
Dom w , Šibenik-Knin County 12775883
Dom w , Šibenik-Knin County 12775883
Dom w , Šibenik-Knin County 12775883
Dom w , Šibenik-Knin County 12775883
Dom w , Šibenik-Knin County 12775883
Dom w , Šibenik-Knin County 12775883
Dom w , Šibenik-Knin County 12775883
Dom w , Šibenik-Knin County 12775883
Dom w , Šibenik-Knin County 12775883
Dom w , Šibenik-Knin County 12775883
Dom w , Šibenik-Knin County 12775883
Dom w , Šibenik-Knin County 12775883
111
USD - $

Dom kup w Oklaj, Żupania Sibensko-Knińska

Osiedle mieszkaniowe
Dom
4736 sqft
2649 sqft
3 Łóżka
3 Łaźnia
2025

In the beautiful small town of Ražanj, in a very nice location, 200 meters from the sea, there will be a villa with a swimming pool (currently under construction), on a plot of 687m2. A high-quality property with muted elegance, in a quiet and green environment with an open view of the sea, will provide the opportunity for a pleasant and relaxed life and vacation, as well as an excellent opportunity in the tourist business throughout the year. The building will be built as one residential unit, with a total net area of ​​246.08 m2, which will consist of a ground floor and a first floor, as well as a basement where technical rooms will be located. TECHNICAL DESCRIPTION  The ground floor consists of: - living room with gas fireplace, dining room and kitchen (63 m2), bathroom, storage and entrance area (9.93 m2) - covered part of the terrace with outdoor shower and lounge area (41.86 m2) - terraces with summer kitchen and gazebo (41 m2 / covered part of the gazebo 22.75 m2) - a garage that is connected to the rest of the ground floor by an internal corridor (23.60 m2) - outdoor parking and access ramp (56.20 m2) - sunbathing areas (76m2) The floor consists of:  - staircase (3.50 m2) and corridor (7.92 m2) - bedroom 1 with bathroom (20.66 m2 + 4.2 m2) + uncovered terrace with greenery (22.01 m2) - bedroom 2 with bathroom (16 m2 + 5 m2) + uncovered terrace with greenery (30.22 m2) - bedroom 3 with bathroom (21.29m2 + 5.19m2) Basement spaces consist of:  -        - Pool service areas (engine room with pool equipment) -         - Water storage -         - Machine room for water installations (room for hydrophore) The flat roof of the building with a net usable area of ​​86.95 m2, on which there are photovoltaic cells for the solar power plant, solar collectors for the production of sanitary hot water, external units for the air conditioning system, and ventilation outlets for the sanitary facilities and the kitchen. A photovoltaic power plant with a total power of 12.3kW will be installed on the flat roof terrace, with an expected production of 17,700.00 kWh per year. A bio-pit with a purifier and an absorption well will be built within the facility. In all rooms except the garage, an air conditioning system with ceiling and wall indoor air conditioning units is provided. Electric underfloor heating is provided for all bathrooms, as well as for the living area (kitchen, dining room and living room). An overflow pool with a volume of 41.76 m3 and an area of ​​27m2 (water heating and cooling) will be built within the building. Also, the pool will have floor infrastructure for the connection of an external jacuzzi tub. A fence will be built around the plot with a pedestrian entrance on the west and east sides of the building, and with an entrance for cars on the east side of the building near the garage, part of which will be fenced off by remote-controlled automatic doors. The parking space is designed in such a way that the object has two parking spaces (garage and uncovered parking), but also the possibility for two more "auxiliary" parking spaces in front of the garage and in front of the open parking lot. The green areas around and on the building will be irrigated with an automatic "drop by drop" system, and the area of ​​230m2 will be planted exclusively with evergreen Mediterranean plants. The facility is equipped with all technical equipment, as well as fixed and movable furniture. The possibility of participating in the project, i.e. the ability of the customer to choose the final equipment, furniture, etc. The estimated deadline for the completion of the facility with the obtained use permit is July 15, 2025. Price on request! Ownership neat, no encumbrances!

Czytaj więcej
Zorica  Mialić
Zespół sprzedaży
Zorica Mialić
Języki: English
Phone
Wiadomość Zorica Mialić
Automatyczne tłumaczenie wiadomości

Możesz być zainteresowany: