rumah beli di Spetses, Attiki
In an amazing location in Spetses and at a distance of 800m from the sea and 1 km from Dapia, a complex is constructed which consists of 8 semi-detached houses of 110-180 sq.m. The houses have been built on a plot of 10,000 sq.m. while the total area extends to another 10,000sqm. privately owned forest. The area offers panoramic views, from Koilada and Porto Heli, to Leonidio in the Peloponnese. Each house is accompanied by its own plot, a rare asset on the island of Spetses. Currently available for sale are 3 houses 108sqm, 125sqm and 162sqm. respectively. All the houses are in the stage of completion and can be sold "as is" or completed "turnkey". The price refers to the sale "as is", while it is estimated that for the completion of the building will need about 35,000€. If the construction company that owns the properties undertakes the completion, the completion time is estimated at 6 months. The house of 125sqm. is developed on 2 levels, ground floor of 96sqm and 1st floor of 38sqm. It has 4 bedrooms and 3 full bathrooms. The corresponding plot according to the contract is 1,963.54sqm. Specifications: The house has ground floor walls made of armed concrete. The window frames are made of solid wood and have double glazing. The roof is made of visible wooden beams, insulating materials and tiles of Byzantine type. There are built-in sofas, fireplace, interior door frames, complete electrical installation, cables, plumbing, marble cladding on most floors and pillars for pergolas. All the walls are plastered and ready for the final painting. The buildings are surrounded by water insulation linings, stone walls for decoration and static support in the surrounding plot, formed paths and small streets for car transportation, big water tanks and water drill with a water pump. These elements already existing in the property as-is. What is NOT offered to get the turnkey: Kitchens, internal doors, formation of the surrounding plot, including the unblocking of the ground floor façade and the placement of cupboards and plastering on the “hidden” the façade, sanitary ware and tiles lining in the bathrooms, construction of the cesspool, lighting and switches installation, woods on the pergolas pillars. The construction was done with a building permit of 2008 and at the moment they are 80% complete. The surrounding area allows the property to accommodate tennis courts, mini golf and other outdoor sports facilities.