Condominio for Køb i Cavacos, Faraón
Spacious 2 bedroom apartment on Vilamoura Marina, only 500m from the beach and 650m from Vilamoura Marina. This is a spacious 2 bedroom apartment in an enclosed condominium with swimming pool, underground parking and 24h security and reception located in the heart of Vilamoura. The apartment is on the 3rd floor with a large lounge area that leads to the terrace. The property also has a spacious and fully equipped kitchen. The 2 bedrooms are very spacious with built-in wardrobes and the master bedroom has an en-suite bathroom. The apartment comes with a parking space and a storage room underground. Close to the beach, the marina, the casino, and all the other amenities, this is perfect for a holiday home without the need for a car. Ref: PP6407 Property Features Apartment Swimming pool 2 bedrooms 2 bathrooms Air conditioning Heating Parking Terrace/Balcony Near bars/restaurants Near schools Near shops Near a golf course Near the beach
Tú podrías estar interesado:
Stunning modern 3 floor villa located at the Hole 27 of Vila Sol Golf Course, with elevator, 5 bedrooms en suite with wardrobes and dressing rooms, south facing with frontline views towards Vila Sol G
Investment opportunity to own an amazing villa, that is currently being constructued in Vilamoura, on the prestigious Vila Sol complex. This location is approximately 5 minutes to the Vilamoura
Investment opportunity to own an amazing villa, that is currently being constructued in Vilamoura, on the prestigious Vila Sol complex. This location is approximately 5 minutes to the Vilamour
Located in the Algarve's Golden Triangle and a few minutes' walk from the renowned Vilamoura Marina, an exclusive resort is born that combines luxury hotels, villas and apartments, with modern finishe
Designed by world-renowned architect, Vasco Viera, the project is due to be completed by 2024 and is currently being launched at introductory rates for the first investors. The units ran
Designed by world-renowned architect, Vasco Viera, the project is due to be completed by 2024 and is currently being launched at introductory rates for the first investors. The units ran